I.
PURPOSE
To define
the Standard Operating Procedure for Operation of Hoist.
II.
SCOPE
This
procedure is applicable for Operation of Hoist in Production Department at Unit-V.
III.
RESPONSIBILITY
Assistant,
Executive - Production
IV.
ACCOUNTABILITY
Head -
Production
V. PROCEDURE
1.0 The hoist shall be used only for material
movement from one floor to another floor.
2.0 Personnel are not allowed in the Hoist.
3.0 Check the loading capacity of the Hoist on
display at operating floors.
4.0 Load the Hoist not more than 75 % of its
total loading capacity.
5.0 Bring the Hoist to the operating floor
upwards or downwards by pressing push button.
6.0 Open the safety gates.
7.0 Open the cage door and load the material on
to the Hoist platform and close the cage
door.
8.0 Material in Hoist should be placed in
closed condition.
9.0 Close the safety gates.
10.0 Operate the Hoist by pressing the push
button i.e. up or down as per the requirement.
11.0 Open the safety gate, cage door and unload
the material from the Hoist.
12.0 Close the cage door and safety gate after
unloading the material from the Hoist.
13.0 Keep the Hoist at Ground
Floor, when not in use.
14.0 Keep the safety gates in closed condition at
all floors when not in use.
VI.
REVISION SUMMARY
Version No.
|
Revised on
|
Reason for Revision |
00
|
NA
|
NA |
END OF THE
DOCUMENT
No comments:
Post a Comment