Saturday 14 September 2013

RETURNED GOODS INVESTIGATION REPORT



A)  Returned Goods Intimation note from warehouse to QA
Product Name


Batch Number
 
Mfg. Date


Exp./ Retest Date


Qty. returned


Returned on

Returned from

Reason for return :

Physical Inspection of the Returned Goods
Observation
Found ok
Not ok
Remarks
Condition of the HDPE / Fibre drum / Shipper / canister



Product labels



Seal intactness



Net weight



Primary packing material condition














Checked by
Ware house
Quality Assurance
Signature



Date








B) Returned goods inspection checklist
S. No.
Check Point
Yes / No
1
Whether reason for return is due other than regulatory reason

2
Whether reason for return is due to damage of secondary packing material

3
Whether reason for return is due to damage of primary packing material

4
Whether integrity of the primary packing material is doubtful

5
Whether quality of the product does not meet the customer specification of quality and safety

6
Whether the material is expired.

7
Any other significant reason which can have impact on quality of product.

8
Whether reason for return is due to quantity.

  Any other observations:



Note:   The reason for the failure is to be investigated, if it is Quality problem / seal is not    
             intact to the container, the material shall be retested as per the standard / provided 
             specifications. QA shall advise for retesting the material.
QA comments:








Executive - QA
Head - QA
Signature



Date






C) Sampling and Testing Request Form

Quality control shall collect the sample of above returned goods for retesting as per the current specification/ Produced Specification.

Analysis detail

a)                  Sample tested as per the specification            : Yes / No
b)                  Any additional testing or review conducted  : Yes / No


Note:   Attach the analytical data along with Certificate of Analysis (COA).


The above material is complying / not complying as per the specifications. Hence the material is Released / Rejected.


           
Sampled & Analyzed By:
Released or rejected By:

Signature

Chemist - QC
Head - QC


Date




Quality Assurance decision form

The above material shall be taken for Repackaging / Relabeling / Rework / Reprocessing/ Destruction as per the procedure.

Note : Batch numbers are allotted as per the SOP for the Reworked / Reprocessed batches.




Signature
Date
Quality Assurance


Production







D) Quality Assurance final checklist

Whether Material is released by QC
Yes / No / NA
Whether material is repacked
Yes / No
Whether the material is relabeled
Yes / No
Whether material is reprocessed/reworked
Yes / No
Whether material is destructed
Yes / No
Whether material is released is Redistribution
Yes / No

QA Decision:


____________________________________________________________________________














           
Checked by (Executive - QA)
Approved by (Head - QA)

Name


Signature


Date




No comments:

Post a Comment